PEUGEOT ENERGYStand-191R Instrucciones Del Producto Original página 18

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 8
assemblY instructions
2
1
B
C
N
C
J
K
4
J
Completely read all assembly instructions before starting to assemble.
Consult the parts list on page 7 for the name and see illustrations of parts.
Some components may be pre-assembled at the factory.
Media roller assembly: Insert the media in the room «N B» as shown in the
1
diagram against. Screw the clamping handle «C» In both locations
designated in the diagram.
Repeat for the other side.
Insert all once mounted on the main frame rail. Screw the clamping handle
2
«G» (M8 x 25) to lock the rail in the desired position.
Attach the carrying handle on the «L» framework using both CHC M8 x 25
3
at the two lock washers and nuts.
4
Attach the wheels on the axle «I» tighten to the aid of locking washers «J»
Secure the assembly to the frame
5
rack, unlock with «A1» handles, and unfold the feets «A2» one by one. Then
straighten the bridge.
100518-manual-B.indd 18
2
I
J
K
J
6
7
To unfold the legs, flip the
3
5
7
en
6
B
A1
C
N
12/08/14 10:48:42

Publicidad

Tabla de contenido
loading

Tabla de contenido