GE AHC18 Manual Del Usuario página 10

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions
4. PREPARE THE CASE
NOTE: Attach curtains to the air conditioner before
placing the air conditioner in the window.
A. Install top mounting rail (if not already installed)
with four type A screws.
B. Slide left-hand curtain assembly into left end of
top and bottom mounting rail. Repeat for right
hand curtain assembly.
C. Fasten curtain retainer strips to the sides of the
outer case with four type A screws on each side.
panels in place.
Side Curtains
10
Screws
Top Channel
Screws
5. PREPARE WINDOW FOR
INSTALLATION
A. Measure the width of the window opening.
B. Mark the center line on the inside windowsill.
A
B
A. Width of window opening
B. Center line
C. Apply the weather seals provided to the bottom,
top and sides of the window to the seal around
the perimeter of the air conditioner.
Cut and apply
weather strip to
front and bottom
edge of window
frame.
Cut and apply
weather strip to
back edge of
the window sill.
Cut and apply
a weather strip
to side of the
curtain frame
(one on each
side).
49-5000445 Rev. 2

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Ahc24

Tabla de contenido