Calibration Kit - Macurco CD-6B Instrucciones Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Macurco CD-6B Manual (Rev-1.0) Eng
A1rt – Alarm 1 Relay Test, energized for 5 seconds, display flashing A1rt
A2rt – Alarm 2 Relay Test, energized for 5 seconds, display flashing A2rt
A3rt – Alarm 3 Relay Test, energized for 5 seconds, display flashing A3rt
gtS – Gas Test, 3 minutes, display flashes between gtS and current gas reading, green LED blinking, relays are
not triggered by gas reading, green LED continues blinking for another minute then becomes solid green
NOTE: If an alarm relay setting has been disabled "diS", the test selection will not be displayed in the test menu.
To perform a manual operation test,
1. From normal operation mode press the NEXT button 2 times to get to the Test Mode (tSt).
2. Press the ENTER button once to get into the Test Menu.
3. Press the NEXT button to scroll through the five test options.
4. Press ENTER to initiate the selected test.
5. Once the test is complete, the display will return to a steady display.
6. Press NEXT until "End" is displayed to exit the test menu.
7. Press ENTER to return to normal mode.

7.2 Calibration Kit

The following steps must be performed when conducting a calibration verification test (bump
test) and calibration to ensure proper performance of the monitor. Failure to do so may
adversely affect product performance.
When performing a calibration verification test (bump test) and calibration only use
certified calibration gas at the required concentration level.
Do not test with expired calibration gas.
Do not cover or obstruct display or visual alarm cover.
Ensure sensor inlets are unobstructed and are free of debris
Failure to follow instructions outlined in this user manual can result in sickness or death.
A Field Calibration Kit, CD6B-FCK, is needed to complete a field calibration. These are available through local
distribution.
Gas cylinder –
o 17L 400 ppm carbon dioxide (CO
o 17L 5% volume carbon dioxide (CO
Gas regulator 0.2 LPM
About two feet of tubing
CD-6-CH calibration hood
Carry case
FCK Information
Several detectors can be calibrated with one FCK. The only limitation is the amount of gas in the cylinder. The 17-
liter cylinder has approximately 85 minutes of continuous calibration run time. Replacement cylinders are available.
REV – 1.0
WARNING
) in air
2
) in air
2
[34-2900-0510-2 ]
26 |
P a g e

Publicidad

Tabla de contenido
loading

Tabla de contenido