eurodent ABSOLUTE Guia De Instalacion página 38

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

E12
E13
Connecting box: fix the main valve for air and water at the
left side, by the two screws supplied.
Pay attention to the flow direction through the valves
(shown by an arrow on the plastic body) when locking the
air and water hoses. The safety electrical connectors set
must be fastened at the box right side, by the screws and
nuts provided.
After assembling these components, refit the plastic
guards.
At the end introduce the two suction pipes in their seats
(the small tubing should be introduced in the more
external seat rightwards) and block them with the proper
clips.
38
ABSOLUTE
Installation instructions

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido