Test Operation - Airo LAIDA Serie Manual De Usuario E Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Test operation

1. Preparation of test operation
● The client approves the air conditioner.
● Specify the important notes for air conditioner to the client.
2. Method of test operation
● Connect the power, press "ON/OFF" button on the remote controller to start operation.
● Press "MODE" button to select AUTO, COOL, DRY, FAN and HEAT to check whether
the operation is normal or not.
● If the ambient temperature is lower than 16°C, the air conditioner can't start cooling.
3. If match with MULTI-S outdoor unit, after installing the complete units,
must test operating when first power on and turn on units to ensure the
correct installation.
The steps of test operation is as below:
A: Use remote controller to select cooling mode and set the temperature in 16°C . Aim
to the indoor display board, press"
"LL" with a long whistle. This indicates the units start to test operating.
B: The test operating is finished when indoor display change to show temperature from
"LL".
C: If the indoor display show "PA" and outdoor unit stop in test operating, indicate the
installation has mistake, please check the cable connection and the pipe connection of
refrigerant. Correct the mistake and start to test operating again.
Note: All the units can operating normally until pass the test operating.
,
,
,
,
,
56
" in 5s, then the indoor display

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para Airo LAIDA Serie

Este manual también es adecuado para:

Laida 09 intLaida 12 intLaida 18 intLaida 24 int

Tabla de contenido