System Design - ITT Goulds Pumps AquaBoost II 1AB2 Instalación, Operación Y Mantenimiento

Control de bomba de velocidad variable
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

System Design

Section 3
Section 3
Note
Systems MUST be designed by qualified technicians only and meet all applicable state and local
code requirements.
The following diagrams show a typical system using the AquaBoost II Constant Pressure System. Connection can be
made directly to a water supply or water can be drawn from a supply tank. Diagram #1 shows a typical set up for a
supply tank.
Diagram 1
System Layout for
Supply Tank
Diagram #2 shows a set-up for municipal water connection. This allows pump maintenance without main line
shut-off.
Diagram 2
System Layout
for Municipal Hook-Up
5
6
3
1
4
5
1 Pump with AquaBoost
Controller
2
2 Diaphragm tank
3 Gate valves
5
4 Check valves
3
5 Pressure gauges
6 Pressure transducer
1 Union
2 Check valve
3 Gate valve
4 Pressure gauge
5 Pressure transducer
6 Main power box
7 Disconnect switch
8 Pressure relief valve

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Goulds pumps aquaboost ii 2ab2

Tabla de contenido