16
16A
16B
16 PLASTERGUARD REPLACEMENT
Replace plasterguard (16A) into Valve Body and secure with Screws (16B).
Proceed to finish wall.
17
1
1
/
" Dia
4
1
1
/
" Dia
4
17 FINISH WALL PREPARATION
Make appropriate holes to finished wall. Price Pfister recommends that all Tub
Spout and Shower Outlet holes be 1
3
wall use 4
/
" diameter.
4
CAUTION: Make sure that leak tests and flushing are performed before
preparing the finished wall.
3
4
/
" Dia
4
1
" diameter. For center hole on plaster
/
4
ENGLISH
NON STANDARD INSTALLATIONS
18
18C
4" Dia
18D
18 THIN WALL INSTALLATION
Knock out Center Section (18A) of Plaster Guard (18B) and remove Screws
(18D). For installation of thin walls, use Support Plate (18C) in addition to
Plaster Guard (18B). For installation to other wall types, do not use Support
Plate (18C). Use of Plaster Guard (18B) is optional. For center hole on a thin
wall use 4" diameter.
19
19C
HOT
19A
19 REVERSED INLET LINES
If hot and cold inlets are reversed (back-to-back installation), (19C) unscrew the
plasterguard and bonnet assembly. Rotate the Bonnet Assembly (19A) 180°
with Notch (19B) facing up and reassemble.
6
18B
SHWR
18B
TUB
18C
19B
COLD
COLD
19A
18A
HOT
180°