D-Link DSN-6000 Serie Guía De Instalación Rápida página 4

Ocultar thumbs Ver también para DSN-6000 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 20
Deployment
Please refer to the following topology and have all the connections ready.
1. Setup the hardware connection before powering on servers. Connect console cable, management
port cable, and iSCSI data port cables in advance.
2. In addition, installing an iSNS server is recommended for dual controller system.
3. Power on IP SAN storage and JBOD (optional) first, and then power on hosts and iSNS server.
4. To ensure MPIO is set-up automatically it is recommended that you log on the target twice (from
controller 1 then controller 2).
Note: iSNS server is recommended for dual controller system.
DSN-6110: 1GbE to SAS/ SATA IP SAN storage, Single controller.
DSN-6120: 1GbE to SAS/ SATA IP SAN storage, Dual redundant controller.
4

Publicidad

Tabla de contenido
loading

Tabla de contenido