Iveco Stralis AT-AD Instrucciones De Montaje página 12

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

ENGLISH
5.
Insert the air conditioner in the housing inside the hatch, facing the right direction and parallel with the hatch opening
(see fig. 5), taking care not to disturb the newly fitted gasket.
Insert the M8x100mm screws CC with washers DD and nuts EE on the provided tubular fixing brackets B, position
6.
the brackets, placing their end section between the fabric covering and the roof. Screw the 4 screws CC into the thre-
aded cylindrical housings on the base of the air conditioner and then tighten the nuts EE against the tubular brackets.
7.
Position the provided electric power cable between the roof and the inner lining, directing the wires towards the front
of the vehicle. Pass them inside the cabinet above the windscreen and the right-hand panel, running them as far as
the fuse panel in front of the passenger seat. Pass them through the provided opening (see fig. 6) and fix them to the
terminals coming directly from the battery (red +, black -) (see fig. 7-8). Connect the supplied power cable to the air
conditioner power connector with the installation kit.
Note: If the electrical wires need to be extended, use a power cable of larger diameter than that provided and protect
it by means of a fuse.
8.
Fix the supplied plastic frame using the original fixings from the vehicle (See fig. 9).
9.
Reconnect the battery.
N.B.: Do not wash or expose to water before 4 hours have passed following installation and in any case not before the
sealant is completely dry.
12
CONDIZIONATORE
Iveco Stralis_AT-AD_Hi-Road_00_07/2018

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hi-road

Tabla de contenido