3
4
5
6
3.2 FIXING THE GROUND SCREWS AS
ANCHORS:
Position the ground screw vertically into the
ground and start applying pressure on the
ground screw while turning clockwise by using
a sturdy wooden or metal bar (not included,
see image 2) threaded through the loop of the
screw (see image 3).
Once the ground screw is digging into the
ground adjust the angle of the screw to around
30° pointing towards the other anchor point
and turn the screw into the ground untill only
the loop sticks out (image 4).
30˚
Repeat the procedures illustarted in image
3 & 4 with the other ground screw for the
second anchor.
In case there is only one ground anchor neces-
sary due to one tree or pole, please read the
instruction manual included for setting up
GIBBON Slackline Sets.
3.3
LOOPED RATCHET BAND TO THE GROUND
SCREW:
Once the ground screws are installed girth
hitch the ratchet system through the loop of
the ground screw as shown on image 5.
IMPORTANT! Make sure that the ratchet
faces up!
3.4 ATTACHING THE SLACKLINE WEBBING
TO THE SECOND GROUND SCREW:
Repeat the procedure before by girth hitching
the slackline webbing on the second installed
ground screw (image 6).
IMPORTANT! Install the ground screws
BEFORE you girth hitch ratchet with looped
ratchet band and slackline to the ground.
screws.
ATTACHING THE
RATCHET WITH
GIBBON MANUAL - ENGLISH