Fitting and commissioning

7.1
CORREX
MP 2.3-900 for socket mounting
®
Note: Observe the instructions set out in chapter 2.3 above
7.1.1 Safety instructions for fitting:
1. Remove any existing magnesium protection anode before installing the
CORREX
2. Never connect the plug-in potentiostat to magnesium protection anodes.
3. The titanium anode must not be in direct contact with internal tank
components or with the tank wall. The quality of the insulation must be
checked with a suitable measuring instrument (e.g digital multimeter or
CorroScout
be immersed in water.
4. The function of the CORREX
electrical parts are safely connected by metallic conductors. The quality of
the galvanic connections must be checked with a suitable measuring
instrument (e.g digital multimeter or CorroScout
5. Use only the original connecting cables
6. Never extend the connecting cables: otherwise risk of connection with
wrong polarity and thus of increased corrosion.
7. Check before commissioning that the cables are not interchanged.
Interchanging the cables results in increased corrosion.
8. For optimal results, the sealing ring needs a 60° chamfer at the sleeve.
Note: If the CORREX
any existing threaded sleeves can be used, if necessary with reducers (galva-
nized steel). Any tampering with system components such as the connecting
cable results in the expiration of the legal warranty.
7.1.2 Drawing: Fitting and commissioning
The illustration on the fold-out page (chapter 1.1) of this manual shows an
example of the installation procedure for a CORREX
screw fitting set. The actual situation depends on tank type, tank size, type of
anode and connecting cable used.
Note: Leave the fold-out page (chapter 1.1) open when installing the system.
CORREX
®
MP 2.3-900 operating instructions
MP 2.3-900 system (in case of retrofitting).
®
®
500). During this measurement, the titanium anode must not
MP 2.3-900 system is installed by way of retrofitting,
®
Operating Instructions CORREX
MP 2.3-900 system is only ensured if all
®
®
®
500).
®
MP 2.3-900 system with
MP 2.3-900
31