Step 5:
Turn drain upright and lower onto "F" flange, aligning all-thread rod with "F" flange
holes.
Step 5
Step 5
Step 6:
From underside of roof, align "D" underdeck clamp holes with all-thread rod. Raise "D"
underdeck clamp against underside of roof deck, and secure with hex nuts and wash-
ers.
Step 6
Underdeck
Step 6
Clamp (-D)
Step 7:
Install upper flashing clamp and dome as required to suit finished roofing system.
Step 7
Step 7
Sump Receiver Installation Instructions
Place the sump receiver over the roof opening making sure that the recessed area will
accommodate the roof drain body while aligning with the leader pipe.
Lower the drain body into the opening and screw the deck flange into the sump re-
ceiver and roof. Insert the adjustable top and screw dome into place.
3