Pre-Operation - Campbell Hausfeld GR2100 Manual De Instrucciones Y Lista De Piezas

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pre-Operation

LOCATION
Selecting the proper location can significantly increase
performance, reliability and life of the unit.
For best results locate the unit in an environment that is
clean and dry. Dust and dirt in the unit retain moisture and
increase wear of moving parts.
Engine
Frame
Engine
Frame
Figure 1 - Mounting schematics (NOTE: all measurements are in inches)
49.00
1.00
9.77
49.00
Lower Frame Mounting Feet
10.67
GR2100, GR2200, GR2300, GR3100, GR3200, GR3300
There are mounting holes in the bottom of the open frame to
permanently mount the unit if desired. The bolt pattern is
15 inch x 23 inch and will accept 1/2 inch bolts.
Store electrodes in a clean, dry location with low humidity to
preserve the flux coating.
Belt Guard
Ø .56
4 Mounting Holes
for a 1/2 inch Bolt
23.00
Belt Guard
Ø .64
4 Mounting Holes
for a 1/2 inch Bolt
0.50
18.76
Gauge Guard
9.38
4 X 1.00
3.72
18.00
Gauge Guard
12.72
www.campbellhausfeld.com
5.22
22.97
15.00
22.97
7

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Gr2200Gr2300Gr3100Gr3200Gr3300

Tabla de contenido