Descargar Imprimir esta página

Operation: Inspection Work; Maintenance; Disposal; Warranty - Mettler Toledo InFlow 76 Serie Guía De Configuración Rápida

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 18
InFlow 76X Series
Installation (side view)
5

Operation: Inspection work

1. V isually check fastenings (ring nut, flange, NPT thread,
or welded connection) of the housing at the process
connection for firm sealing and absence of leaks.
2. I f necessary, check the condition of the electrode / sensor
(refer to sensor instruction manual for cleaning and
calibration procedures).
6

Maintenance

1. I solate the pipe / tank / vessel etc. from the housing
(depressurize, empty, rinse, purge and vent, etc.).
2. R emove the sensor from the housing.
3. R emove the InTrac / InFit housing from the InFlow housing
(if changing of housing seal is needed).
4. C hange the housing seal.
5. C alibrate / clean the electrode / sensor with reference to
sensor and transmitter instruction manuals.
7

Disposal

It is the user
a professional manner and in accordance with local
regulations.
8

Warranty

On manufacturing defects, 12 months after delivery.
9

Storage conditions

Please follow the shutdown procedure as described in
the  housing instruction manual. The cleaned and dried
housing should be stored at room temperature.
10

EC Declaration of Conformity

The complete declaration is available in the Declaration of
Conformity certificate.
InFlow 76X Series
Printed in Switzerland
s responsibility to dispose of the housing in
'
© 07 / 2019 Mettler-Toledo GmbH