Tripp-Lite SRCOOL7KRM Manual Del Usuario página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
(continued)
Threaded-Hole Rack Installation
1
Align the mounting rail
along the inside surface of the
A
rack posts
so that the flanges on the ends of the rail wrap
B
around to the front and rear surfaces of the posts and the rail
holes meet the threaded holes on the rack post.
2
Secure the shelves
to the mounting rails permanently using
A
user-supplied screws and washers
Place 6 screws total at the front and 4 screws total at the
back.
Tighten all screws before proceeding.
Warning: Do not attempt to install the SRCOOL7KRM
until you have inserted and tightened the required
screws.
3
Follow steps
and
of the Square-Hole Rack Installation
3
4
instructions to securely mount the SRCOOL7KRM.
Directional Vent Installation
The directional vent can be installed to provide downward or upward airflow.
For Upward Airflow
1
Make sure the opening on the directional vent is facing upward. Align the vent with top
opening on the front face of the SRCOOL7KRM and push it in firmly.
For Downward Airflow
1
Using a flathead screwdriver, remove the blocking plate
located below the air filter cover. Take out the foam insert
2
Push foam insert
into the top opening on the front face of the SRCOOL7KRM. Align the
B
blocking plate
A
with the top opening on the front face of the SRCOOL7KRM and push it in
firmly.
3
Make sure the opening on the directional vent is facing downward. Align the vent with the
bottom opening on the front face of the SRCOOL7KRM and push it in firmly.
for your rack as shown.
C
A
from the SRCOOL7KRM. It's
.
B
B
A
1
A
C
2
1
1
2
3
5
A
B
C
B
A
B
A

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido