NOTE: Electrical connection must be performed
by a qualified installer only.
NOTE: The electrical connection must comply
with National and Local codes.
A strain relief for the supply cord is required. The
installer must provide a supply cord bushing that
meets all Local and National Installation Stan-
dards.
KW/
KW/
Voltage
V lt
Section
8
230
8
400
Phase
Ph
Frequency
F
(Hz)
1
50
3
50
7
Installation
Electrical Connection
Connect the oven to a separate group 230V, 50 hz
with rigid connection and circuit breaker. The cir-
cuit breaker should disconnect all poles, including
neutral with a contact separation of at least 3 mm.
1Φ Units:
Connect L1 + neutral + ground.
3Φ Units:
Connect L1 + L2 + L3 + neutral + ground.
Max Load
L1
L2
35
---
16
8
L3
N
---
35
9.5
8