Altair AL-2167 Instrucciones De Instalación página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY AND INSTALLATION:
INSTALLATION (Fig. 2)
5.
Unhook the lanyard hook [P] from the fixture [A], and then tuck all the wires,
connections, and the lanyard hook [P] into the outlet box [O].
6.
Place the wall plate [N] over the outlet box [O], making sure the fixture screws [G]
feed through the holes on the wall plate [N]. Adjust the fixture screws [G] until they
protrude out from the wall plate [N] 7.6 mm / 0.3 in / 0.3 po. Remove the wall plate
[N] and secure the position of the fixture screws [G] by tightening the hex nuts [E]
against the mounting bracket [D].
7.
Carefully tuck all wires [H-M] and wire connectors [C] into the outlet box [O]. Place
the wall plate [N] back onto the fixture screws [G]. Place a washer [Q] over each
fixture screw [G] and secure the fixture [A] into place using the lock nuts [B].
8.
After installing the fixture [A], caulk the upper 2/3 of the wall plate [N] to the mounting
surface. Leave the bottom 1/3 un-caulked to allow for drainage of any water that might
leak into the enclosure. The manufacturer recommends a non-drying exterior caulking
material. A good example is a clear silicone rubber sealant for exterior use.
9.
Restore power at the circuit breaker. Turn on the wall switch.
Fig. 2
Q
B
A
A. Fixture
B. Lock Nut
G. Fixture Screw
N. Wall Plate
O. 10.2 cm / 4 in. Outlet Box
Q. Washer
G
5
O
N

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

1193817

Tabla de contenido