Installation
the depth of the cooler. Level cabinet.
Step 3 - Applying Sealant
•
Draw an outline on the base of the floor.
•
Raise and block the front side of the cabinet.
•
Apply a bead of NSF Approved Sealant (see list below) to floor half an inch inside the outline drawn. The
bead must be heavy enough to seal the entire cabinet surface when it set down on the sealant.
•
Raise and block the rear of the cabinet.
•
Apply sealant on floor as outlined above on other 3 sides.
•
Examine to see that the cabinet is sealed to floor around entire perimeter.
NSF APPROVED SEALANTS:
•
Minnesota Mining #ECU800 Caulk.
•
Minnesota Mining #ECU2185 Caulk.
•
Minnesota Mining #ECU1055 Bead.
•
Minnesota Mining #ECU1202 Bead.
•
Armstrong Cork - Rubber Caulk.
•
Products Research Co #5000 Rubber Caulk.
•
GE Silicone Sealer.
•
Dow Corning Silicone Sealer.
NOTE: Asphalt floors are very susceptible to chemical
attack. A layer of tape on the floor prior to applying the
sealant will protect the floor.
DRAFT BEER TOWER INSTALLATION
1. Beer tower contents.
2. Thread the beer line connector to the keg coupler.
3. Insert an air hose into the beer tower and secure the beer tower to cabinet with the gasket under the beer
tower.
4. Make sure the air hose closes at the top of beer tower at all times. This is to keep the beer faucet cold.
5. Secure the handle onto beer faucet.
BEER DISPENSING SYSTEM
6