Kohler K-6284 Guía De Instalación Y Cuidado página 8

Tanque y armazón dentro de la pared
Ocultar thumbs Ver también para K-6284:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Front View
Threaded
Rod
Lag Bolt
4. Install the Carriage
Move the carriage into place in the stud pocket.
Temporarily secure the carriage in place so it will not fall.
Align the carriage flush with the front edge of the studs. The
front of the carriage should be flush with the front edge of the
studs or set back slightly for finished wall installation.
Check the front of the carriage for plumb.
Mark the hole location for each foot.
Drill a pilot hole (remove the carriage if needed) to reduce the
risk of the lag bolt causing the stud to split or crack.
Secure the feet of the carriage to the studs using 2" (51 mm)
(minimum) lag bolts (not supplied).
Install the threaded rods several turns into the carriage.
1142998-2-D
Leg
8
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido