ERS 2G
3/3 Installation procedure
Follow these steps:
1) Choose a location not affected by accidental liquid splashes or dusty air flows. If
possible, the ERS must be close to the VVVF inverter.
2) The ERS must be installed in a vertical surface.
3) One of the ERS sides has an arrow signaling the direction the ERS must be positioned
on the wall. Screw the ERS to a vertical surface as shown in the next figure, with the
arrow pointing up. If positioned differently, the ERS will not be adequately cooled and it
could be damaged.
In the same way, a minimum air gap of 250mm must be guaranteed in the upper and
lower sides of the ERS, as shown in previous figure. Otherwise, the ERS will not be
adequately cooled and it could be damaged.
Instalation guide
>250mm
ERS 2G
powered by
E N: BE CAREF UL , S TO RED CHARG E, WAIT
1 M IN UT E
E S: CUI DAD O, T EN SI ÓN RE SI DUA L,
E SPE RE 1 M IN UT O
>250mm
27