Electrical Connections - Aqua DGTEC CD Manual De Instrucciones

Ocultar thumbs Ver también para DGTEC CD:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 104
dGdoser Model
Programmable digital peristaltic pump
Connecting the conductivity meter probe
1. Probe
2. Electrodes
3. Maximum level of water
4. Tank wall
5. Rubber gasket
6. Nut
7. Washing pump filter

2.4 ELECTRICAL CONNECTIONS

Before performing any intervention on the pump, disconnect the power supply voltage of the
machine!
Connect the pump cable to a voltage that is compatible with the one on the label.
For the connections refer to Fig. 6.
ADSP7000634
Fig. 5- Conductivity meter probe connection
Fig. 6- View from below
rev. 1.2
INSTRUCTION AND MAINTENANCE MANUAL
30/06/2014
ENGLISH
41/206

Publicidad

Tabla de contenido
loading

Tabla de contenido