Test Run - MrCool DIY Serie Manual De Instalación

Ocultar thumbs Ver también para DIY Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Test Run

Before Test Run
Only perform test run after you have completed
the following steps:
Electrical Safety Checks - Confirm that
,
the unit s electrical system is safe and
operating properly.
Gas Leak Checks - Check all fare nut
connections and confirm that the system is
not leaking.
Confirm that gas and liquid (high and low
pressure) valves are fully open.
Test Run Instructions
You should perform the Test Run for at least 30
minutes.
1. Connect power to the unit.
2. Press the ON/OFF button on the remote
controller to turn it on.
3. Press the MODE button to scroll through the
following functions, one at a time:
COOL - Select lowest possible temperature
HEAT - Select highest possible temperature
4. Let each function run for 5 minutes, and
perform the following checks:
For more details visit www.MrCool.com
List of Checks to Perform
No electrical leakage
Unit is properly grounded
All electrical terminals
properly covered
Indoor and outdoor units
are solidly installed
All pipe connection
points do not leak
Water drains properly
from drain hose
All piping is properly
insulated
Unit performs COOL
function properly
Unit performs HEAT
function properly
Indoor unit louvers
rotate properly
Indoor unit responds to
remote controller
8
PASS/FAIL
Outdoor
Indoor
(2):
(2):
Page 26

Publicidad

Tabla de contenido
loading

Productos relacionados para MrCool DIY Serie

Tabla de contenido