7
SPARE PARTS
Before use we advise you to have spare parts
in store, see table B in the appendix of this
manual.
8
TECHNICAL INFORMATION
•
See for technical specifications table C in
the appendix of this manual.
AT 300-US series
9
9.1
The heater has a flue stack connection.
1. Push a T-piece (A) directly over the
connection (B).
2. Push the flue pipe (C) on the T-piece.
3. Use three screws to screw the flue pipe
to the T-piece.
•
The flue must be pointed upwards.
•
The flue (or any part of it) may not be
positioned horizontally. A 45° angle is
acceptable.
•
It is not allowed to lenghten the flue
connection horizontally.
•
When a pipe is used under 45°, pipe
pieces of at least 1 m must be fitted in
front of and at the back of the slanting
pipe.
•
The flue must stick out at least 0,5 m
above the apex of the building.
•
Keep the vertical part at the back of the
heater as long as possible before leading
it outside through the wall.
4. Fit the following pipe pieces.
5. Place a cap (D) at the end of the flue.
9.2
/i
AT 306
5.9 inch
10
For the standards and guidelines, go to
www.thermobile.nl.
40.020.941 - rev. 04 - 2011
INSTALLING ACCESSORIES
Flue (fig. 9)
Caution
The flue must meet the following
requirements.
Diameter flue
AT 307
5.9 inch
STANDARDS AND GUIDELINES
English
17