Bernal D1000 Indicaciones De Seguridad Instrucciones De Montaje página 12

Tabla de contenido

Publicidad

ORIGINAL ASSEMBLY AND OPERATING INSTRUCTIONS
GB
Check before the installation
To ensure the necessary security and the smooth operation of
the actuators, the following preconditions must be checked:
» The installation of the housing of the electronic control units
(see relevant instructions) must be performed with such a di-
stance from the actuators, that the motor cable absolutely
doesn't need to be extended.
» For use in masonry or concrete posts, we recommend using
chemical anchor bolts or anchor bolts which guarantee a stress-
free mounting.
» The gate must be suitable for the actuator system. It must
especially be ensured that it is sufficiently strong and rigid. For
metal gate leafs we recommend establishing the connection to
the actuators with screws. For wooden gates the fixing screws
must be fully supported on the inside and outside with metal
plates, since otherwise the screws could loosen over time.
» The dimensions and weights must match the specifications of
the technical properties.
» Check for the smooth and uniform movement of the leafs and
make sure that there is no friction or obstructions during the
entire movement.
» Also ensure the perfect condition of the hinges.
» Mechanical stops for the „Gate CLOSED" position must be
present.
» If necessary, remove any present locks and stoppers. It is
recommended that any blacksmithing be carried out before
mounting the actuators.
12
After the installation
» The passage between the leafs is prohibited as long as they
are in motion. Before passing through the leafs, the full opening
should be awaited.
» The dwelling of persons between the leafs is strictly prohibited.
» The presence of people or the placement of objects in the im-
mediate vicinity of the gate system is prohibited. This especially
applies during the operation.
» There is an increased risk of injury in the immediate vicinity of
the posts. Due to the negative leverage effect the safety switch-
off is not limited to 150 N in this area.
» The movement of the leafs should not be counteracted
deliberately.
» Branches and shrubs may not interfere with the operation of
the automatic gate system.
» The systems of the indicator light display should always be
functional and clearly visible.
» The leafs should only be moved manually after the disenga-
gement/release has been performed.
» Before attempting any work on the system, the electrical pow-
er supply should be disconnected.
» In the event of malfunctions, the leafs must be disengaged/
released to allow a passage. It should be waited until qualified
personnel is available for technical assistance.
» We recommend performing an operating capability test of the
gate system, security devices and accessory equipment at least
once every six months through qualified personnel.

Publicidad

Tabla de contenido
loading

Tabla de contenido