GreenWorks 4104107 Manual De Utilización página 3

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 9
EN
DE ES IT FR PT NL RU FI SV NO DA PL CS SK SL HR HU RO BG EL AR TR HE LT LV ET
OVERVIEW
1 compressor
2 pressure vessel
3 condensate outlet
4 safety valve
5 connection for compressed air (quick
coupling), regulated compressed air
6 manometer control pressure
7 pressure regulator
8 manometer boiler pressure
9 ON/OFF Switch
10 air filter / air filter housing
11 transport handle
COMMISSIONING
CATIONS
Assembly (depending on model)
1. Mount the tyres as shown (see fig. A).
2. Mount the rubber feet as shown (see fig. B)
3. Screw the enclosed air filter (10) onto the air inlet (see
fig. C)
Check condensate outlet
Ensure that the condensate outlet (3) is closed.
Installation
The positioning site of the device has to meet the
following requirements:
– Dry, protected from frost
– Stable, horizontal and even surface
Wrong positioning might cause serious accidents.
– Secure the device against rolling away, tilting and
slipping.
– Safety installations and operating elements have to
be easily accessible at any time.
Transport
– Do not pull the device from the hose or mains cable.
Transport the device at the transport handle (11).
Generating compressed air
OPERATION
Power-supply connection
High voltage.
Operate the device in dry surroundings only.
Operate the device only at a power source meeting the
English (Original Instructions)
DANGER
DANGER
following requirements: Wall sockets installed according
to regulations, earthed and tested; fuse protection
according to the technical data.
Position power supply cable so it does not interfere with
the work and is not damaged.
Check every time if the device is switched off, prior to
plugging the mains plug into the socket outlet.
Protect power supply cable from heat, aggressive liquids
and sharp edges.
Use only extension cables with sufficient core cross-
section.
Use extension cables for outdoor areas. When working
outdoors, only use the correspondingly marked extension
cable approved for this purpose.
Do not switch off the compressor by pulling the mains
plug, but use the ON/OFF switch.
Always install an RCD with a maximum trip current of 30
mA upstream.
Generate compressed air
1. Switch on the device using the ON/OFF switch (9)
and wait, until the maximum boiler pressure has
been reached (compressor switches off). The boiler
pressure is shown at the boiler pressure manometer
(8).
Set the control pressure at the pressure reducer (7) . The
current control pressure is shown at the control pressure
manometer (6) .
The set control pressure must not exceed the
maximum operating pressure of the connected
compressed air tools!
2. Connect the compressed air hose at the compressed
air inlet (5) .
3. Connect the compressed air tool. Now you can work
with the compressed air tool.
4. Switch off the tool if you don't want to continue
working immediately. Afterwards pull the mains plug.
5. Drain the condensed water of the pressure vessel at
the condensate outlet (3) on a daily basis.
(E)
3
CAUTION

Publicidad

Tabla de contenido
loading

Tabla de contenido