Descargar Imprimir esta página

Stuv TULOX 100 Instrucciones De Montaje página 15

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions TULOX 100 + TULOX 200
8.
Align the base plate vertically and mark the drilling position for the fastening screws.
9.
Completely remove the base plate again and drill the fastening holes with a spiral drill Ø 3.5
mm. Pay careful attention that the base plate is not contaminated with bore chips.
10. Replace the base plate. Pull the spare cable length into the inside of the unit. Attach the base
plate with the enclosed cylinder head screws. The wall of the base plate must not deform du-
ring this process.
11. Plug the cable connector on the rear side of the lock case into the provided jack.
12. Insert the batteries (4 x 1.5V, AA, LR6) paying attention to the terminal direction and replace the
cover.
13. Check the proper function in accordance with the user manual with the door open.
Steinbach & Vollmann Ibérica, S.L. • 20500 Arrasate - Mondragón • España
- 15 -

Publicidad

loading

Este manual también es adecuado para:

Tulox 200