2. Cut Track to Fit Application 3. Installing Hangers INTO TRACK Track From the open end of track, slide Hangers into track as shown. Installing Hangers with Soft Close into track, refer to Soft Close Instructions. Hanger 2-1/8" 4. Install Track a) Make sure track is level.
Página 3
Hook fascia onto top groove and pull bottom forward to snap bottom into place, working from one end towards the other. Use with Side Wall Mount 2-1/2" SLAL-250-SW 2-3/4" 3" SL-SQ20 4" 4" 3-1/4" Use with By-Pass SLAL-250-BP Pocket SLAL-250-PD SL-RD SL-SQ18...
Página 5
INSTRUCCIONES DE INSTALACION erraje uerta orrediza SLaL-250-BP uertaS orredizaS oLganteS SLaL-250-Pd uerta orrediza mPotrada SLaL-250-SW uerta orrediza de ared JUEGO DE INSTALACION INCLUYE: 1 Riel de Cabecera 1 Juego de Herrería Universal (2 Juegos de herrajes para las puertas colgantes corredizas)
Página 6
2. Corte el Riel a la Medida 3. Instalación de las Correderas DENTRO DEL RIEL Riel Desde el lado abierto del riel deslice las Correderas hacia adentro del riel como se muestra. Para la instalación de Correderas con Cierre Suave dentro del riel, siga a las Instrucciones de Cierre Suave.
Página 7
Use con 2-1/2" Puerta de Pared Deslizante SLAL-250-SW 2-3/4" 3" SL-SQ20 4" 4" 3-1/4" Use con Puertas Corredizas Colgantes SLAL-250-BP Puerta Corrediza Empotrada SL-RD SL-SQ18 SLAL-250-PD...