Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.3 FLUSH/PURGE

Depending on the type of foam agent in use, it is recommended to flush the system
periodically. This can be done once a month.
➢ For this operation, proceed as follows:
-
Keep the pump at idle pressure with no output.
-
Set the selector valve first to REFILL
-
Set the flush valve to FLUSH.
-
Set the metering valve to 1%.
-
Water will discharge from the flush outlet behind the control panel. Allow to flow
for 15 seconds at the 1% position, then slowly turn the metering valve 360°
to flush the other concentration positions. The whole of this operation will take about
60 seconds.
At the end of this operation, return the system to the off position:
-
Set selector valve to OFF.
-
Set flush valve to FOAM.
-
, then to FOAM.
11

Publicidad

Tabla de contenido
loading

Productos relacionados para Leader FLOWMIX Serie

Este manual también es adecuado para:

Flowmix 500Flowmix 750Flowmix 1000

Tabla de contenido