Heat Pump Operation - Gorenje TC 200 Serie Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CONNECTION TO THE POWER SUPPLY NETWORK
In order to connect the hot water storage tank with the heat pump to the power supply network first install an electrical socket
suitable for the current load of 16 A.
Connecting the heat pump to the power supply network must take place in accordance with the standards for electric appliances.
To comply with the national installation regulations, an all poles disconnect switch must be installed between the heat pump and
the power supply network.
T2
T3
3
4
6
L
N
9
10
Figure 9: Connection to the power supply network

HEAT PUMP OPERATION

The heat pump can be operated using an LCD touch screen (Fig. 10). If you press anywhere on the screen, the screen lights up.
When the screen is lit up, the operation fields are active.
When the heat pump is connected to the water and power supply mains and the boiler is filled with water, the heat pump is ready
to be used. The heat pump heats the water in the range 10 °C - 65 °C. From 65 °C - 75 °C the water is heated by electrical heaters
(models ZG and ZGNT).
1
20
2
3
4
5
6
7
8
Figure 10: Operation display
T1
QUART
PROG.
BUZZ1
4
3
K4
2
1
1
2
K5
FAS3 FAS2
K3
3
1
4
2
K9
1
3
2
1
2
4
K1
3
K7
2
4
K6
5
1
K11
7
8
19
18
17
o
C
9
10
2
R
1
S
C
1
2
K10
5
LEGEND
1
Signalization of the operation of solar collectors
2 Alternative source of heating/turned on
3 Signalization of the backup operation
4 Indication, overview of operation errors, entrance
into the service menu
5 Display and setup of temperature in °C
16
6 Start and setup of the VACATION programme
7 Day of the week
(1 .. Monday, ..., 7 .. Sunday)
15
8 Reducing the value
9 Heat pump on/off switch
10 Increasing the value
11 TIMER start and setup
14
12 Time setup and display
13 Start-up of quick heating "TURBO"
14 Indicator of the heating element operation
13
15 Start-up of heating to the maximum temperature
level
16 Signalization of compressor operation
12
17 Signalization of anti-legionella programme operation
18 Warm water quantity display
19 Signalization of defrosting
11
20 Signalization of fan operation
LEGEND
T1 Bar with sensors
T2 Evaporator – temp. sensor
T3 Air temperature sensor
1 4-way valve (Models ZGNT)
2 Compressor
3 PV function
4 Fan
5 Electric heating element (2 x 1000W)
(Models ZG and ZGNT)
6 Thermal cut-out
7 Magnesium anode
8 LCD touch screen
9 Housing - ground
(in case of a metal casing)
10 Boiler - ground
29

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tc 300 serieTc 301 serieTc 302 serieTc 201 serie

Tabla de contenido