Descargar Imprimir esta página

Fontanot ZEN 2 Instrucciones Para El Ensamblaje página 7

Ocultar thumbs Ver también para ZEN 2:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

baluster at the top, secure the handrail A22 (leave the amount of handrail required to secure
baluster C03, which goes at the end and has not been inserted yet) using articles C64 and a
screwer. Join the handrail elements A22 with articles B33 and D72. Determine the height of the
balusters found on the ends of the railing, cut and insert into elements F23-F29 locking them with
article B02.
17. Assemble articles F23 to the treads, in an intermediate position, using elements C14, B83, C49,
C13, B02 (fig.1) (fig. 3). Cut the balusters C03 to measure and secure in elements F23, locking
them with articles B02. Secure the balusters to the handrail A22 using articles C64. Check the
verticality of each baluster.
Final Assembly
18. Check thethe verticality of the entire staircase and, if necessary correct by moving support N16
(fig. 1).
19. Dismantle the first tread L73 and drill the floor using a Ø 14 mm point in the same place as the
openings found on support N16 (fig. 1).
20. Inserts elements C39 and secure in a permanent manner (fig. 1).
21. Mount the first tread back into position L73 and secure to the floor, next to the first baluster C81,
with element F01, drill using an Ø 8 mm point. Use elements B11, B12 and B02. Insert the baluster
(C03) and tighten element B02 (fig. 1).
22. Cut off the excess handrail next to the first and last baluster and complete assembly by inserting
element A37 using article C64 and glue X01 (fig. 1).
23.Insert articles B82 into balusters C67 to complete staircase assembly (fig. 1).
24. To further stiffen the staircase, fasten parts F09 to the wall and join them to the balusters CB6
using parts F08. Drill using an 8mm Ø bit and use parts C50, C49, C58, B12 (Fig. 1).
067806000_istr_montaggio_ZEN_2_DUM_09-17.indd 7
7 - ZEN 2
27/09/17 12:16

Publicidad

loading