Operation; Charging The Rechargeable Battery - Crane AU5-cdAT-2A Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Operation

Situation
Water sports (e.g. diving)
*The specification of m/ft refers to the air overpressure used in connection with the
watertightness test for the transmitter unit in accordance with DIN 8310.
Operation

Charging the rechargeable battery

The charge status of the rechargeable battery is shown on the display. The charge
status is indicated using the following symbols:
Watertight to 30 m/95 ft*
No.
31
USA

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Au5-cdat-2bAu5-cdat-2cAu5-cdat-2d

Tabla de contenido