EN
Mounting
Before mounting this product, read the
F100CM) from CHAUVET, or the M12 threaded mounting holes on the product. Make sure the mounting devices are
capable of supporting the weight of the product. For more information on how to mount the F2, download the User
Manual from www.chauvetprofessional.com. For our Chauvet line of mounting clamps, go to
productcategory/truss-clamps/.
Mounting Diagram
Rigging Eye Bolt
Alignment Conical (x2)
M12 Threaded Mounting
Male Speego
M12 Threaded Mounting
Male Speego
Male Speego
M12 Threaded Mounting
•
Warning! The magnetic attachments are not load-bearing, and are intended for alignment
assistance only. Do not release panel until the hanging hardware has been fully secured.
•
The M12 mounting points are not intended for hanging or suspending from a truss or other
overhead structure.
3
QUICK REFERENCE GUIDE
Safety
Notes. Use rig bars (DRB-F50CM, DRB-F100CM, RB-F50CM, or RB-
Hole
Hole
Hole
Male Speego
Male Speego
http://trusst.com/
Rig Bar Speego
Female Speego
M12 Threaded Mounting
Hole
Female Speego
M12 Threaded Mounting
Hole
Female Speego
Female Speego
M12 Threaded Mounting
Hole
F2 QRG Rev. 3