Descargar Imprimir esta página

Black Box E3 Manual De Instrucciones página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

E3 PROVIDER BACKHAUL UNIT, 6-PORT
1. Unpack the E3 Provider Backhaul Unit, 6-Port and inspect the contents. Your
package should contain the following items.
• E3 Provider Backhaul Unit, 6-Port
• (4) rubber feet
• (10) rackmount screws
• (1) power cord (AC only)
• (2) rackmount brackets
• This users' manual.
If anything is missing or damaged, contact Black Box at 724-746-5500.
2. Select the site. When selecting a site for the Provider Unit, consider the
following:
• The maximum recommended ambient temperature is 86°F (30°C). Consider
the internal temperatures of the rack.
• Place the unit in such a manner that the cables will not become a tripping
hazard or become dislodged from the unit.
• Do not block the power-supply vents or otherwise restrict airflow when
installing the unit in a rack.
• Consider the mechanical loading of the rack so that the rack remains stable
and unlikely to tip over.
• Consider the overall loading of the branch circuit before installing any
equipment in a rack environment.
• Maintain a reliable grounding path in the rack system. For rack mounting,
attach the rackmount brackets to the sides of the unit at the desired position.
3. Connect power to the Provider from an appropriate power source. Verify that
the power LED is lit.
Verify that the switches on the front of the unit are in the appropriate
positions for the E3 line. (See Table 2-1 on the next page.)
6
2. Installation

Publicidad

loading