Werner AH2210 Serie Instrucciones De Instalación página 14

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Section 1.2
TOOLS AND MATERIALS NEEDED
Materials:
• Several pieces of joist-sized lumber (the amount depends on the specific installation).
• 16d sinker nails or screws of equivalent strength (24 - 60 depending on the specific installation).
• 20d sinker nails or screws of equivalent strength are needed for installation where joists are cut.
Stepladder:
• You need a stepladder that is tall enough so that you can get into the overhead space without
stepping above the working height of the stepladder. The working height of the stepladder is two
steps down from the top.
• Your stepladder must also have a Duty Rating that is greater than the sum of your weight plus the
weight of the attic ladder.
Be careful when using a stepladder to climb into and out of the overhead space
Tools For Creating a Rough Opening:
• Flashlight or extension light
• Claw hammer
• Pencil
• Hand saw / power saw
• Tape measure
• Framing square
• Tools to cut a hole in the existing ceiling
Safety Equipment:
• Gloves
• Safety goggles
• Dust mask
WARNING
13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ah2510 serieAe2210 serie

Tabla de contenido