Descargar Imprimir esta página

Bradley S19-672 Instalación página 2

Depósito de 5 galones con lavaojos y manguera de aspersión, depósito de 5 galones con lavaojos
Ocultar thumbs Ver también para S19-672:

Publicidad

Idiomas disponibles

Idiomas disponibles

S19-672, S19-671
Read this installation manual completely to ensure proper installation, then file it
Installation
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
Packing List
discarding any packaging material. If any parts are missing, do not begin installation
IS
T H
E
S ID
U P
until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow.
The inspection and testing results of this equipment should be recorded weekly to verify
proper operation. This equipment should be inspected annually to ensure compliance
with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per ANSI
Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY.
Product warranties and service parts information may also be found under "Products"
on our web site at www.bradleycorp.com.
Supplies Required:
• Pipe sealant
• Clean air pressure equipment or supply capable of up to 100 psi
• Sign-mounting hardware
2
IMPORTANT
4/14/09
Bradley Corporation • 215-321B Rev. N; ECM 09-05-0003
Installation

Publicidad

loading

Este manual también es adecuado para:

S19-671