Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Before assembling parts, please check the parts quantity according to
the PARTS LIST.
2. Carefully unpack and spread out all parts in a large uncluttered area.
3. Familiarize yourself with all parts and compare them with the drawing
below to make sure none are missing. Read all assembly instructions
before beginning.

PARTS LIST

* Homak recommends bolting the
top chest to the rolling cabinet
using the attachment pieces.
TOP CHEST
ROLLING CABINET
A) Foam Drawer Liners
For Each Drawer
And Top Till
C) 2 Attachment
Pieces
E) Top Chest Handle
Bolts
Attachment Pieces
- 2 -
B) Keys
D) 4 Bolts
F) 2 Screws For
Top Chest Handle
After the top chest is
placed on the rolling
cabinet, use the
attachment pieces (Part E)
and hardware provided
(Part F) to bolt the
attachment pieces securely
to the rolling cabinet.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Professional h2pro bk02036081Professional h2pro bl02036081Professional h2pro rd02036081

Tabla de contenido