Jilong Z-RAY I Serie Instrucciones De Uso página 5

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 34
INFLATING AND DEFLATING THE BOAT
Installation of seat bench
Insert the rods into the seat retaining tubes. Slide the seat into position by
inserting the retaining tubes into the grooves, located at each end of seat bench.
Insert into both ends of the seat at the same time. Position the seat to be in the
middle of the retaining tubes.
Structure of the safety valve
A. Valve cap
B. Inflating mouth
C. Deflation button
D. Protective sheath
D
8
A
C
B
www.jilong.com
ZBI-13-GB(V1)
INFLATING AND DEFLATING THE BOAT
Inflating
Unscrew the valve cap A, assemble the Inflation Adapter with inflating mouth E,
air pressure meter and the air pump.
Caution: Do not over inflate, or use a high-pressure pump!
Please inflate air chambers by number sequence. Do not over inflate.
Maximum pressure for air chambers
0.25bar(3.63PSI)
After inflating screw the valve cap A in clockwise direction by hand.
Deflating
Remove the valve cap A, push down the deflation button C and turn the valve
by 90° until its is locked. Release the valve and the air will flow out. If you want
to stop the deflation, push down the deflation button C and turn it by 90°. The
deflation will stop when the valve is released.
9
E
www.jilong.com
ZBI-13-GB(V1)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Z-ray i 200Z-ray i 300Jl007012nJl007012-1n

Tabla de contenido