5.0 FINISHING
POWER SUPPLY SERVICE MUST BE COMPLETED PRIOR TO FINISHING TO AVOID
HEAT VENTS AND AIR OPENINGS CANNOT BE COVERED IN ANY CIRCUMSTANCES.
5.1
NEFI18H-HD LOG PLACEMENT
1
Place the log (#1) onto the pins. Ensure the log is
secure onto the pins, as shown.
3
#3
Place the log (#3) into the groove. Ensure the log
is secure, as shown.
WARNING
!
RECONSTRUCTION.
PIN
#1
2
#2
Place the log (#2) onto the pins. Ensure the log is
secure onto the pins, as shown.
4
Place log (#4) into the groove. Ensure the log is
secure, as shown.
13
PIN
#4
W415-1754 / A / 06.08.17
EN