2.1. ELECTRICAL SUPPLY INSTALLATION.
The electrical installation of the equipment making up the system must be carried out by specialised
personnel according to the applicable standards.
The location must fulfill the following conditions:
Place: Dry and ventilated, far enough away from the welding area in order to prevent the metal dust
caused by the welding process from getting into the equipment. The equipment must not be used in the rain.
PLACE THE WELDING MACHINE ON A FIRM FLAT SURFACE.
IF EQUIPMENT OF THIS KIND TIPS OVER IT CAN HAVE VERY SERIOUS CONSEQUENCES.
The electrical connection of the WCS-510 cooling module is carried out through a hose, which connects it
to the rear of the GALA INDUSTRIAL power source (see the power source instructions manual).
The general installation process is described in the GALA INDUSTRIAL power source manual. Read this
section carefully.
CHAPTER 3.
START-UP. ADJUSTMENT AND OPERATION CONTROLS.
In principle, the connection of the system and the preliminary operations must be carried out as indicated
in CHAPTERS 2 and 3 of the GALA INDUSTRIAL power source instructions manual.
After mounting the modular system the following preliminary operations must be carried out on the cooling
module:
Fig. 3. Operations prior to the start-up of the WCS-510 cooling module.
WCS-510
C
MAX
MIN
1
st
. FILL UP THE COOLING TANK.
We recommend using:
75% DISTILLED WATER + 25% ALCOHOL
Fill the tank within the indicated limits.
2
nd
. PURGING THE AIR.
In order to eliminate any air on the inside of the
cooling circuit.
3
rd
. PUMP UNLOCKING.
11