Installation
Section 2
2.1 — Contents
What is Included in this Carton:
• Manual Transfer Switch with Utility and Generator main breakers mechanically interlocked preventing utility and
generator from powering the load at the same time
• Hardware Kit (including Bonding Screw and Label to convert switch to Service Entrance rating)
• Documentation: Installation Manual and Product Registration card
2.2 — Required Tools
2.2.1— Tools and Items Needed for Installation:
• Safety eye goggles
• 1/4" and 11/32" nut drivers
• Straight blade and Phillips screwdriver
• Electric drill and drill bits
• Wire cutter/stripper
• NEW 2-pole, 60 Amp or 100 Amp 125/250V circuit breaker to install in main load center (see Table 1) manufactured by
same as main load center
• Appropriately sized conduit, fittings, lock nuts and wire
• Anchors and screws to mount transfer switch to wall
2.2.2— Optional Items for Installation:
• Power Inlet Box that mounts outside for convenient generator connection to transfer switch
• Power Cord to connect generator to transfer switch via the power inlet box
2.3 — Specifications
Model
Max Generator Size in Watts (continuous)
UTILITY MAIN breaker, 1 Included, 1 additional
required
GEN MAIN breaker, included
NEMA Type Enclosure
Max 1-pole Circuits / Max 2-pole Circuits
Transfer Switch Installation Guidelines
Table 1: SPECIFICATIONS
6333
15000 watts
60 Amp
60 Amp
NEMA 1
NO PROVISION FOR BRANCH
CIRCUIT
6334
25000 watts
100 Amp
100 Amp
NEMA 1
NO PROVISION FOR BRANCH
CIRCUIT
5