General; General Terms Of Delivery; Voltage; Water Treatment - Zodiac Red line 3 Manual De Instalación Y De Uso

Ocultar thumbs Ver también para Red line 3:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 35

1. GENERAL

1.1 General terms of delivery

Any equipment, even CARRIAGE and PACKING FREE, travels at the consignee's risk. The consignee
shall make reserves in writing on the carrier's delivery bill if he notes damage caused during the
transport (confirmation to be sent to the carrier within 48 hours by registered mail and Acknowledgement
of Receipt).

1.2 Voltage

Prior to any operation, check that the voltage on the identification plate of the appliance corresponds to
the mains voltage provided on site.

1.3 Water treatment

In order to use our appliances in the best conditions, swimming pool water shall comply with the
following values: free chlorine: max. 2.5 mg/L, total bromine: max. 5.5 mg/L pH between 6.9 and 8.0. For
any other treatment, the fitter and the user shall apply to the supplier of the planned disinfection's
process (chemical, electrochemical or electro-physical) for the compatibility with the materials of our
appliances. In any case, treatment shall be installed downstream the heating equipment.

2. DESCRIPTION

2.1 Presentation

1
2
8
1- flow switch
2- cable crossing
3- "Bazic" control thermostat
4- ½ union Ø63/50 fittings
5- positive safety (or overheating) thermostat
6- power contactor
7- connection terminal
8- titanium heating element, with pockets for control and high limit sensors

2.2 Dimensions

3
Red Line 3
Red Line 6
Red Line 9
Red Line 12
2
7
6
5
Model
A (mm)
538
538
638
638
4
B (mm)
452
452
552
552

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Red line 6Red line 9Red line 12

Tabla de contenido