Installation - brennenstuhl SH 4000 E Instrucciones De Empleo

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39
Solar power with external solar panel

7.1 Installation

Step 1:
Open up the house
number light
Unscrew and remove the screws [14] from
the underside of the light using a small
Phillips-type screwdriver.
Fig. 4: Underside
Step 2:
Mark out the mounting
holes
Using the rear panel as a template, mark
out the mounting holes [14] with a pencil.
Fig. 5: Rear view
Tip: Use a spirit level when marking
out the mounting holes. This will
subsequently ensure that the light is
mounted horizontally.
Step 3:
Drill mounting holes
DANGER: When drilling and
installing screws, take care to avoid
damaging electricity cables and gas and
water pipes. This could lead to severe
injuries and damage.
NOTE: Obtain suitable fastening
materials from an appropriate retail outlet.
Example:
Drill two mounting holes (6 mm diameter) in
the substrate and insert suitable plugs.
User's Handbook SH 4000 E
14
4
Step 4:
Secure the rear panel to the substrate.
TIP: Use a spirit level to adjust the
rear panel so that it is level.
Step 5:
See Section 7.2
Step 6:
See Section 7.3
Step 7:
With a small Phillips-type screwdriver,
install the screws [14] on the underside of
the house number light.
Step 8:
NOTE: It is advisable to mount the
solar panel in a position where it is exposed
to direct sunlight. The duration of
illumination depends on the intensity of the
sunlight.
Using the mounting base as a template,
mark out the mounting holes with a pencil.
Step 9 :
DANGER: When drilling and
installing screws, take care to avoid
damaging electricity cables and gas and
water pipes. This could lead to severe
injuries.
NOTE: Obtain suitable fastening
materials from an appropriate retail outlet.
Example:
Drill two mounting holes (6 mm diameter) in
the substrate and insert suitable plugs.
Step 10:
CAUTION: Take care to ensure that
the connecting lead does not become a trip
hazard.
17
Mount the rear panel
Affix the house number
Install battery
Fit the house number light
Mark out the mounting
holes
Secure the solar panel
Lay the connecting lead
Stand: 06_2011 rev. 02

Publicidad

Tabla de contenido
loading

Tabla de contenido