Cable Installation - Preparation; Center Bar Removal - Detail View - Leviton Opt-X Ultra 5R1UH-S08 Instrucciones Para Usar

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CABLE INSTALLATION - PREPARATION

Top View: Tray to Front
NOTE: Tray in forward position, covers
and center bar removed for clarity.
Pictured: Removable tray to facilitate field
termination
Page 6 of 30
COMMENTS:
• Route cable to tray through grommet on the opposite
side of slide tray tie down point
• Assure cable slack for tray movement.
• Recommended trunk breakout length is 36 inches.
• 20 inches of breakout is required from the first tray lacing
point to provide adequate slack for individual cassette
travel.
• A minimum of 14 inches of free slack is required to each
cassette for bend radius compliant accessibility from the
front side.
To remove tray from enclosure, slide tray fully forward
(Warning: No front pin/rear stop point is provided with this
enclosure.)
NOTE:
Pictured: Center bar removal - detail view
To remove center steel support bar, depress latch as
shown per arrow in diagram below.
NOTE:
• Do not remove bar
before installing
enclosure in rack.
• Center bar is required
for operation of the
removable covers.
• Replace center bar when
service is complete.
DI-007-5RXUH-20A

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Opt-x ultra 5r2uh-s16

Tabla de contenido