Electrical Connections - Bauer OBBI Manual Para La Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23
-
Extend the haulage tube completely [11] to its maximum
length, then shorten it by approximately 20mm (fig.3).
Attention: the stops must keep a 10 mm margin of tube
stroke, in both the door wing closed and door wing open
positions.
-
With the gate completely closed, position the front bracket
[15], check it is aligned with the rear bracket and fix it to
the gate.
-
Fix the piston to the front bracket with the pin [G] supplied
(fig.6). To work correctly, the gearmotors must be assem-
bled with the motor casing at the top.
-
Unblock the gearmotor and check (moving the gate ma-
nually) the entire stroke is free of interference. Slightly
lubricate the front and rear articulated joints.
-
Assemble the tube cover [12] with the cap [13] and seal,
and fix it with the screws [H] supplied (fig.7).
Pay attention to the insertion direction. The slits on the
closing cap [13] must be on the lower part in order to help
the water to come out.
-
Assemble the casing [10], fixing it with the screw [N], paying
attention to the positioning of the cable.
3.3 OBBI3BFCH limit switch adjustment
The OBBI3BFCH geared motor is fitted with magnetic limit
switches. Adjust the limit switches in order to obtain the cor-
rect opening and closing of the automation, as indicated in fig.
9-10.
4.

ELECTRICAL CONNECTIONS

The gearmotors OBB13BH-OBB13BFCH can be connected to
the E2H control panel.
The electrical wiring and the start-up of the gearmotors OBBI3BH
and OBBI3BFCH are shown in fig.8 and in the installation
manuals of the E2H control panel.
5. MAINTENANCE PROGRAM (every 6 months)
Disconnect the 230 V~ power supply and batteries if present:
-
Clean and lubricate, using neutral grease, the turning pins,
the hinges of the gate and the drive screw
-
Check that fastening points are properly tightened.
-
Check the electrical wiring is in good condition.
Reconnect the 230 V~ power supply and batteries if present:
-
Check the power adjustments.
-
Check the good operation of all command and safety
functions (photocells).
-
Check the good operation of the release.
-
If the E2H control panel is mounted, check for battery
continuity by powering off and performing several
manoeuvres in sequence. Upon test completion, power
back on (230 V~).
ATTENTION: For spare parts, see the spares price list.
13
GB
OBBI - IP1639

Publicidad

Tabla de contenido
loading

Tabla de contenido