Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Do not attempt any direct intervention or repair but contact professionally qualified staff. If the power supply
cable is damaged, switch-off the appliance and contact only professionally qualified staff for its replacement.
All listed devices must be conform to the relative national standards in force; the manufacturer is not to be
considered responsible for plants that are not correctly executed and non-compliance with the standards.

START-UP

When commissioning the appliance it is necessary:
Open the cock supplying the softener.
Open a cock for air inside the ducts bleeds and the resins are washed. The outlet water may, for a few minutes,
be dark coloured. Leave it to run until is "cleaned", before using it.
Check for leaks from the hydraulic connections.
Connect the transformer plug to the specific socket in the rear part of the valve.
The software version of the board will be displayed for a few seconds upon commissioning and, subsequently,
the time with "Clock setting" flashing.
Use the UP and DOWN keys to vary the time, once current time is reached press OK to confirm. "Clock Setting"
will disappear and "Service" will be displayed permanent.
Fill the salt vat with water as follows:
3)
MANUAL WATER FILLING
Pour one litre of water inside the salt container for each litre of resin contained in the softener cylinder.
(Example: for a 9 lc of resin softener, pour 9 litres of water). The water will subsequently be automatically
loaded.
4)
AUTOMATIC WATER LOADING
Keep the DOWN key pressed until "Regeneration Start" is displayed. While the writing is displayed,
press the OK key twice until "F3" appears in the top-left corner. If it is overcome, press OK in
succession and the "F..." cycle will start again.
Wait for the display to show "Regeneration" and "F3" flashing.
After a few minutes, "Filling" will appear at top, "F3" permanently and the remaining time at the side,
until completion of operation.
At the end of the time, "Regeneration ending" will appear and, after a few minutes, the valve will go
back into service showing the current time and "Service".
Once the vat is loaded, check the valve suction. Press and keep the DOWN key pressed until "Regeneration
Start" is displayed and "F1" flashing. After a few minutes "F1" will appear permanently with the phase time. At
the end of the time, check if the resin suction was completed.
At the end of F1, press the DOWN key until "F3" is flashing to automatically load again the vat
checking if the first loading degree is followed.
Fill 3/4 of the salt container with SALT (salt in PADS is recommended as it has less impurities than coarse salt).
The valve is ready for performing cyclesautomatically.
cod.B010006
Pag. 20
30/08/2019

Publicidad

Tabla de contenido
loading

Tabla de contenido