1-1/4" (3.2 cm) D.
60" (152.4 cm)
to Floor
Apply silicone sealant.
5. Install the Control Kit
NOTICE: Do not locate the control kit directly above the steam outlet.
Make sure that the power is turned off at the main breaker panel before proceeding.
Locate the control pad on the wall 60" (152.4 cm) up from the floor.
At the selected location, drill a hole 1-1/4" (3.2 cm) in diameter.
NOTICE: Do not pinch, nail, wedge, or use undue force when handling the control connector and the
control pad wire. Any damage may result in control kit failure. If the control pad is not installed
immediately, protect the control connector with tape or other shielding material.
Pull the control connector from the steam generator through the drilled hole.
Carefully plug the control connector to the control pad wire using the double-end female connector
(provided).
Restore the power at the main breaker panel.
Turn on both water and power to the generator.
Test the control pad to ensure it is functioning properly. Refer to the "Using the Control Pad"
section.
Remove the adhesive backing from the back of the control pad.
Apply a continuous bead of silicone sealant around the back edge of the control pad and around the
perimeter of the adhesive area.
Press the control pad firmly onto the wall.
Apply a bead of silicone sealant around the outside edge of the control pad.
Allow the silicone sealant to cure for 24 hours before use.
Kohler Co.
Control Connector
Control Pad
Remove adhesive backing.
Back View
11
Apply silicone sealant.
1008019-2-K