Prepare The Site - Kohler K-638 Manual Del Usuario

Ocultar thumbs Ver también para K-638:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

24" (61 cm)
Min
13" (33 cm) to
19" (48.3 cm)
12" (20.5 cm)
Min

2. Prepare the Site

CAUTION: Risk of product damage. The media box is rated to operate in temperatures up to
104°F (40°C). Do not install under a whirlpool surround or in any location where the temperature
may exceed 104°F (40°C).
The media module is designed to fit within a 13" (33 cm) to 19" (48.3 cm) wide 2x4 stud cavity. The
cavity should be free of cross bracing and insulation.
Locate the upper bracket a minimum of 24" (61 cm) down from the top of the stud cavity and a
minimum of 32-1/2" (82.6 cm) above the bottom of the stud cavity.
Measure 2-5/8" (6.7 cm) to 2-7/8" (7.3 cm) in from the stud face to determine the bracket placement.
Mark the bracket locations with a pencil.
Install a 120 V GFCI electrical outlet within the stud framing, in close proximity to the media
module.
If used, run the Ethernet cable to the media module installation site.
Using a hole saw, drill 1" (2.5 cm) holes through the studs at the top and bottom of the wall cavity
to allow for proper air flow.
1069763-2-D
Pencil
2-5/8" (6.7 cm) to
2-7/8" (7.3 cm)
Pencil
20-1/2"
(52.1 cm)
Media Box
(not installed)
Outlet
Drip Loop
6
Drill 1" (2.5 cm) holes at
top and bottom of wall
cavity for ventilation.
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido