Front Runner Slimline II Instrucciones Para El Montaje página 4

Portaequipajes de techo
Ocultar thumbs Ver también para Slimline II:
Tabla de contenido

Publicidad

Fit the foot rails Cont...
E
(
)
Place the assembled Foot Rails onto the
vehicle's roof, lining up the mounting
holes in the bottom of the Foot Rails with
the mounting points on the vehicle. The
Product Sticker must go to the rear of the
Product Sticker
vehicle and must be facing outwards.
Push the Foot Rails as far back as
possible.
( F )
Secure the Foot Rails to the vehicle using the M8 x 40 Hex Bolts, M8 Spring Washer and M8 x 19 Flat
Washers (Items 2, 3, 4). Place a M8 Nut Cap (Item 1) over each Bolt Head once fastened.
4
REV_A01

Publicidad

Tabla de contenido
loading

Productos relacionados para Front Runner Slimline II

Tabla de contenido