De Dietrich DU15 Manual Del Usuario página 18

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42
Position
Reference
1
9793-0485
2
9793-0471
3
9793-0468
4
9793-0465
5
9793-0486
6
9793-0487
7
9793-0488
8
9793-0489
9
9793-0491
10
9793-0492
11
9793-0493
12
9793-0494
13
9793-0495
14
9793-0497
15
9793-0498
16
9422-5605
17
300005912
1.2 General
The neutralisation station with pump is used to neutralise acid
condensates from condensing boilers, flue gas pipes or condensers.
The condensates flow through a tank filled with aggregate and are
neutralised (pH higher than 6.5).
Neutralisation stations - Pack no.
DU 15
2
Number
1
1
1
1
1
Connecting elbow + nut
1
1
1
1
1
1
1
1
1
Pump pressure switch (Pp)
1
Anti-overflow pressure switch (Pcs)
1
10 kg drum of condensates granules
Discharge pipe Ø 32-19 Length 360 mm C210/
1
The condensates are then discharged using the pump (maximum
elevation: 3 m) and can be disposed of in the waster water network.
The electrical connection of the neutralisation station can be made to
the boiler safety contact. One thus avoids any condensates overflow
from the neutralisation station into the premises in which the unit is
installed.
Nominal output
300-1300 kW
DU15
Description
Connecting pipe
Connecting T
Connection fitting
Clamp
O-ring
Sheet gasket
Connection nipple
Grill
Power supply cable
Connection cable
Suction pump
DU 15 tank
C310
Dimensions
Ø 19 x 1500 mm
Ø 19
1"
G 1"
Ø 24 x 3
Ø 23 x 15 x 3
Ø 16 - 3/4"
Ø 600 x 400 x 293
10 kg
Weight (kg)
20
04/12/2013 - 8541-4017-02

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Rci 300Rci 400Rci 500Tc 400Tc 600Tc 800 ... Mostrar todo

Tabla de contenido