Install Latch; Aluminum Insert; Rebar And Concrete; Railing Gates - CertainTeed Bufftech Instrucciones De Montaje

Puertas de vinilo
Ocultar thumbs Ver también para Bufftech:
Tabla de contenido

Publicidad

3. Install Latch

      I nstallation may vary based on gate hardware kit ordered. Refer to latch installation instructions included with  
your gate hardware for exact instructions.
4. Installation Instructions When Using Aluminum Insert
Optional Post Support
Designed for use in end, hinge and latch post
Installing insert into post
(insert into post before setting post)*
Drive a screw through the vinyl into the  
aluminum in the bottom of post. This will prevent 
the insert from moving inside the post.
Routed Post
    I nsert aluminum  
into post with  
open end facing  
routed hole.
Blank Post
    M ake sure that you  
set your post so that  
you will be attaching  
the hinge plate to the  
aluminum in both  
directions.
Attaching Hinge Plate
    T o attach hinge plate to post with insert, 
pre-drill a 5/32" pilot hole for screws.
NOTE: Insert will not work in corner, line or 3-way posts.
* Refer to rebar separator clip instructions if not using aluminum insert.
5. Installation Instructions When Using Rebar and Concrete in Posts**
•    C onnect two pieces of 1/2" rebar together with 
rebar separator clips. Length of rebar should 
extend from bottom of hole to 12" from top of post.
•    I nsert rebar in opposing corners of all hinge, latch 
and end posts.
•    T he use and placement of rebar is critical for the 
strength and quality of the fence installation.
•    F ill fence posts with concrete mix to cover rebar 
and gate hardware fasteners.
•    T amp out any air pockets with a rubber mallet.
•    L eave gate on blocks for concrete to set up. 
Remove blocks after 72 hours.
** Caution – In climates that experience freeze-thaw cycles, this installation method could result in post cracking.
This would not be covered by the warranty.

6. Railing Gates

 Post should be reinforced with post support kit or sleeved over a wood post.
6
Rail
Hinge Plate
GROUND LEVEL
INSERT
INSERT
INSERT
GROUND LEVEL
SCREW
SCREW
GROUND LEVEL
Position rebar in opposing
corners of post, using rebar
separator clips
SCREW
INSERT
GROUND LEVEL
SCREW

Publicidad

Tabla de contenido
loading

Tabla de contenido